The inspection standards of the main parts of the concrete mixing stations

November 2, 2020

Latest company news about The inspection standards of the main parts of the concrete mixing stations

Here are the inspection standards of the main parts of the concrete mixing stations that should be checked before they are put into production:

1. Ensure that there is no blockage in the concrete mixing station's transmission and moving parts, silo or funnel door and pipe.

2. The fluid level of oils in the lubricating oil tank should be within the authorized height.

3. Open the valve to discharge the surplus water caused by the separation of the gas water separator in the gas circuit system; open the drain plug of the air storage tank to discharge out the mixture of oil and water.

4. The steel wire rope of the elevator bucket and pull shovel should be installed and spooled correctly; the steel wire rope and pulley conform with the regulation; the brakes of the elevator bucket and pull shovel should operate smoothly.

5. Ensure that all the bolts have been fastened, all the inlet and discharge vales are not over-wear, and all the conveyor belts have a suitable degree of tightness.

6. All the controlling and displaying parts of the weighing devices can work normally and have the standard weighing accuracy.

7. All the electrical devices can effectively control machines' operation; all the contact points, moving and static contacts have no obvious abrasion.